XCMG Rotary Drilling Rig Facilitates Construction of Beijing Winter Olympics Subway
Mar 06, 2020
Large blank space in the middle of the southern section of Line 14 and Line 10. It connects the two major hubs of Lize Business District and Beijing West Railway Station and lifts the western section of Line 11. The four stations are scheduled to start trial operation by the end of 2021, and will serve the Beijing Winter Olympics.
Xugong's spin-drilling Shougang Station is only one kilometer away from the Winter Olympics single-board jumping platform viewing area. It must be opened to traffic before the Winter Olympics. The design of the protective piles is 1 meter in diameter and 33 meters in depth. It is a cobblestone stratum. The construction period is relatively tight.
XCMG's third-generation "E" series rotary drilling rigs are launched with the highlights of "more efficient, more stable, versatile, intelligent, and comfortable". The XR360E uses an H-type hydraulic telescopic crawler chassis and is equipped with a large-diameter slewing bearing to ensure Strong stability and transportation convenience. The hydraulic system uses load sensing technology, which is more efficient and energy efficient. The imported engine has strong power, which effectively reduces fuel consumption and use costs.
Previous: 2020 Egypt International Building Materials Exhibition
Next: Shandong Lingong foreign market news reports spread frequently